Étude de cas

Stabilisation de fondation ferroviere grace au système de stabilisation des sols ALLU

Sweden

Matériau Swamp, soft peat and clay

Secteur Mélange, Solidification, Stabilisation

Application Stabilising

Fonction Stabilising, Solidification, Mixing

Modèle ALLU Soil Improvement System

Problème

The original railroad had been constructed on very soft soil and settling foundation which needed to be modernized and stabilized. This project also involved the construction of a new double railway track.

Solution

The total area of soil in need of stabilization was about 6500 m2, up to a depth of 3-4 m. The ALLU Soil Improvement system stabilized the area in one month. Binder used in this project was a mixture of cement (70%) and merit (30%).

Avantage

The complete ALLU Soil Improvement System stabilized the area cost and time efficiently, with no expensive haulage costs as there was no need for a mass exchange of material.

Produits apparentés

Étude de cas

Solidification de fondation avec le processor ALLU

Netherlands

Matériau Wet soil and mud

Secteur Solidification

Application Solidification

Fonction Solidification

Modèle ALLU Processor 500HD

Problème

The job site was located on wet swampland which was to be used for a housing and warehousing development.

Solution

Prior to commencing any excavation work, the ground first had to be solidified by mixing and adding lime and fly ash with the ALLU Processor 500HD Power Mixer.

Avantage

Following the solidification process the area was made strong enough to bear excavators enabling the excavation process to proceed. This also led to improved operational safety on the site as well as improving the quality of the material excavated which was to be used for foundations on the development.