Asiakastarina

ALLU Soil Improvement järjestelmä vahvistaa rautatien perustuksen

Sweden

Materiaali Swamp, soft peat and clay

Toimiala Maaperän stabilointi, Pilaantuneen maan käsittely, Sekoitus

Käyttökohde Stabilising

Käyttötarkoitus Stabilising, Solidification, Mixing

Malli ALLU Soil Improvement System

Problem

The original railroad had been constructed on very soft soil and settling foundation which needed to be modernized and stabilized. This project also involved the construction of a new double railway track.

Solution

The total area of soil in need of stabilization was about 6500 m2, up to a depth of 3-4 m. The ALLU Soil Improvement system stabilized the area in one month. Binder used in this project was a mixture of cement (70%) and merit (30%).

Benefit

The complete ALLU Soil Improvement System stabilized the area cost and time efficiently, with no expensive haulage costs as there was no need for a mass exchange of material.

Related Products

Asiakastarina

ALLU Processor – Suoalueen vakautus

Netherlands

Materiaali Wet soil and mud

Toimiala Pilaantuneen maan käsittely

Käyttökohde Solidification

Käyttötarkoitus Solidification

Malli ALLU Processor 500HD

Problem

The job site was located on wet swampland which was to be used for a housing and warehousing development.

Solution

Prior to commencing any excavation work, the ground first had to be solidified by mixing and adding lime and fly ash with the ALLU Processor 500HD Power Mixer.

Benefit

Following the solidification process the area was made strong enough to bear excavators enabling the excavation process to proceed. This also led to improved operational safety on the site as well as improving the quality of the material excavated which was to be used for foundations on the development.

Related Products