Problem
Excavated material unrefined cannot be used to backfill for pipeline padding. The customers costs were increasing to remove the material and bring in correct material to site.
Solution
The ALLU D-Series of screening buckets with TS drums for pipeline padding is an absolutely ideal addition to pipeline job sites worldwide. The unique ALLU TS structure enables two different fragment sizes from the same ALLU Screening Bucket, giving you more flexibility at the site. Due to TS’s self-cleaning design, you can be certain to get the best possible capacity even with wet and sticky materials. ALLU TS structure features various blade thicknesses, making the TS structure perfectly suited to the pipeline industry to screen, reuse, and recycle the excavated soil.
Benefit
The customer increased efficiency and reduced costs and time. As they do not need to bring in separate materials to the jobsite or take those materials away.