Fallstudie

ALLU PROCESSOR STABILISERAR GRUND FÖR VÄG

China

Material Wet and soft sludge

Industri Stabilisering

Tillämpning Pipeline Padding

Funktion Stabilising

Modell ALLU Processor 300HD

Problem

The high water content found in sludge on a road foundation job site was making the land unfit for use with insufficient load-bearing capacity.

Solution

The area affected by the sludge was stabilized and treated using an ALLU Processor 300HD power mixer. This increased the road foundation bearing capacity up to 30 tons.

Benefit

The stabilizing process proved to be an environmentally friendly and cost-efficient way to increase the bearing capacity of the foundations enabling what was considered to be unstable ground to be used as a road.    

Related Products

Fallstudie

ALLU STABILISERINGSSYSTEM STABILISERAR GRUND FÖR JÄRNVÄG

Sweden

Material Swamp, soft peat and clay

Industri Mixning, Solidifiering, Stabilisering

Tillämpning Stabilising

Funktion Stabilising, Solidification, Mixing

Modell ALLU Soil Improvement System

Problem

The original railroad had been constructed on very soft soil and settling foundation which needed to be modernized and stabilized. This project also involved the construction of a new double railway track.

Solution

The total area of soil in need of stabilization was about 6500 m2, up to a depth of 3-4 m. The ALLU Soil Improvement system stabilized the area in one month. Binder used in this project was a mixture of cement (70%) and merit (30%).

Benefit

The complete ALLU Soil Improvement System stabilized the area cost and time efficiently, with no expensive haulage costs as there was no need for a mass exchange of material.

Related Products

Fallstudie

ALLU STABILISERINGSSYSTEM STABILISERAR GRUND FÖR EVAKUERINGSVÄG

USA

Material Swamp, rich on peat and vegetation

Industri Mixning, Stabilisering

Tillämpning Stabilising

Funktion Stabilising, Mixing

Modell ALLU Soil Improvement Complete System

Problem

An existing two-lane Miami highway was to be expanded into four-lanes so that it was better suited for any necessary evacuation of the locale. The length of the road was approximately 9 miles (15 km), with its width increasing from 40 ft. to 60 ft. (from 12 to 20 m). Material to be processed in order to expand the highway included parts of a swamp, peat, decomposing vegetation, and fresh vegetation, as well as wet sand.

Solution

In order for the highway to be expanded safely and efficiently, the project required stabilization to depth of 12 ft. (4m). The ALLU Soil Improvement System stabilized the ground in situ in an environmentally friendly way. 

Benefit

The ALLU Soil Improvement System increased the road’s bearing capacity and safety. In addition, the contractor benefited from savings in time and money with no need to bring in new materials due to the efficient and effective re-use of existing materials.

Related Products