Étude de cas

Processor Allu stabilisant des routes

China

Matériau Wet and soft sludge

Secteur Stabilisation

Application Pipeline Padding

Fonction Stabilising

Modèle ALLU Processor 300HD

Problème

The high water content found in sludge on a road foundation job site was making the land unfit for use with insufficient load-bearing capacity.

Solution

The area affected by the sludge was stabilized and treated using an ALLU Processor 300HD power mixer. This increased the road foundation bearing capacity up to 30 tons.

Avantage

The stabilizing process proved to be an environmentally friendly and cost-efficient way to increase the bearing capacity of the foundations enabling what was considered to be unstable ground to be used as a road.    

Produits apparentés

Étude de cas

Stabilisation de fondation ferroviere grace au système de stabilisation des sols ALLU

Sweden

Matériau Swamp, soft peat and clay

Secteur Mélange, Solidification, Stabilisation

Application Stabilising

Fonction Stabilising, Solidification, Mixing

Modèle ALLU Soil Improvement System

Problème

The original railroad had been constructed on very soft soil and settling foundation which needed to be modernized and stabilized. This project also involved the construction of a new double railway track.

Solution

The total area of soil in need of stabilization was about 6500 m2, up to a depth of 3-4 m. The ALLU Soil Improvement system stabilized the area in one month. Binder used in this project was a mixture of cement (70%) and merit (30%).

Avantage

The complete ALLU Soil Improvement System stabilized the area cost and time efficiently, with no expensive haulage costs as there was no need for a mass exchange of material.

Produits apparentés

Étude de cas

Système d’amélioration du sol ALLU stabilisant des fondations de route d’évacuation

USA

Matériau Swamp, rich on peat and vegetation

Secteur Mélange, Stabilisation

Application Stabilising

Fonction Stabilising, Mixing

Modèle ALLU Soil Improvement Complete System

Problème

An existing two-lane Miami highway was to be expanded into four-lanes so that it was better suited for any necessary evacuation of the locale. The length of the road was approximately 9 miles (15 km), with its width increasing from 40 ft. to 60 ft. (from 12 to 20 m). Material to be processed in order to expand the highway included parts of a swamp, peat, decomposing vegetation, and fresh vegetation, as well as wet sand.

Solution

In order for the highway to be expanded safely and efficiently, the project required stabilization to depth of 12 ft. (4m). The ALLU Soil Improvement System stabilized the ground in situ in an environmentally friendly way. 

Avantage

The ALLU Soil Improvement System increased the road’s bearing capacity and safety. In addition, the contractor benefited from savings in time and money with no need to bring in new materials due to the efficient and effective re-use of existing materials.

Produits apparentés