Valencia harbour

Application description:

Huge time and money savings are possible with ALLU stabilization system.

In Valencia, Spain the area that needed to be stabilized was about 300 000 m2 and it was stabilized into 3 - 5 m depth. The planning of the project started in 2003 and the planning was made by Ramboll Finland.

The stabilization process was started in Valencia 7/2005 and the job site was finished 7/2006.

Technical information:

Country

Spain

Model

PM500 (two units), PF 7 and PF 7+7