Stabilizing road junction in Tampere

Application description:

The working method used was stabilizing in blocks of 4 m x 5 m and in 3 m depth using ALLU power mixer.

In part of the area 100kg/m3 cement was used as a binder and in the other part 150kg/m3. The average working capacity reached was 7 blocks (4mx5m) in 8 hour day. This included also the spreading of geo textile and gravel.

ALLU PM Power Mixer is efficient tool and part of the whole ALLU stabilization system.

Technical information:

Country

Finland

Model

PM 300

Contact us

For further information, please leave your details below