Pipelinepadding in Sweden

Application description:

Fine material size is accepted for plastic pipes. The right end product size was achieved when working with ALLU screening bucket equipped with fine screening drums.

The re-use of the excavated material saves natural resources. In addition, working with screening bucket saves time and money, because there's no need to build roads for material transportation. Also there are no costs from new material.

Other environmental issues are also achieved when working with ALLU screening bucket, because the job site traffic can be minimized. Exhaust fumes and noise pollution are significantly reduced. 


Pictures: Leveranstidningen Entreprenad, Monica Almgren

Technical information:

Country

Sweden

Model

DSB 3-12/15 mm screening bucket

Material

soil/forest soil

Contact us

For further information, please leave your details below